Deadline met with room to spare- just!
When we set out on major worked we always set targets which not only can we achieve but that we have a minor leeway if we hit a snag, however with our new indoor hall we set a target on the same principle however due to a stalled start date we soon used up the contingency and left ourselves with a deadline of tomorrow for phase one to complete. phase one is the ground works and completion of all work below ground level- the foundations, drainage , structural columns and floor slab. Yesterday in some of the heaviest rain witnessed here at Eriska we completed the major works leaving today- with the help of a brisk wind and sunshine to level out the surface and prepare the road for the arrival of the structure on Monday.
So no we are ready although tomorrow we will have to continue with the rolling of the surface to compact the slab in preparation for the 30 tonne crane and two low loads of steel. the next deadline will be to complete the structural erection and then clad it by the middle of November and then we will be back on site and finish the walls and storage areas. then it will be a matter of waiting for thefloor to dry out before we can complete the project, install the surface of the hall and have a grand opening- all seems so simple and so far so good!
Posted by Beppo Buchanan-Smith at 06:21 PM in Scottish hotel life, Scottish sport, Sports | Permalink